Your workplace move is now a WHS matter.

We engage staff early on relocations, consolidations and new buildings, and build a psychosocial risk register for your WHS team.

Why a move triggers early consultation

Poorly managed change is a recognised psychosocial hazard. In NSW, the Code of Practice expects organisations to consult affected workers and their health and safety representatives as early as possible on new work locations and the redesign of existing workplaces. From 1 July 2026, NSW organisations must comply with approved codes of practice, or manage risks to an equivalent or higher standard.[1]

Outside NSW, the national model Code of Practice, the basis for most state and territory codes, also says consultation on workplace changes and redesigns should occur as early as possible.[2] In Victoria, the Psychological Health Regulations, in force from 1 December 2025, name poor organisational change management as a hazard.[3]

In Australian universities, campus moves take place in a workforce where psychosocial safety climate risk is more than double that of the general workforce.[4]

When proper consultation started after the design

A university moved staff into a new building with shared, activity-based workspace, in line with university policy. Heads of school and other representatives were consulted on the design, but the staff who would work in the building were not adequately represented before it was complete. Staff in student-facing roles said the plan left them no enclosed room to step away and recover after difficult conversations with students.[5] By their health and safety representative's account, staff had taken the issue to their union, their managers, an all-staff forum and consultative committees, and nothing was done.

The representative then issued a provisional improvement notice to the vice-chancellor, naming it a psychosocial hazard.[6] The university's WHS lead responded within days with a first option, which staff turned down. In the staff working group Six Ideas ran, staff weighed it against an alternative and decided among themselves. The issue was resolved with the university about two weeks after the notice, with no formal dispute.

That outcome rested on trust built earlier in the engagement. Staff who had felt shut out of the design now had a channel they trusted for working with the university. Being upfront about what could and could not change in the finished building ended the speculation, and staff focused on the options that were actually available.

How we work with your WHS team

Planning and early engagement

We work with leaders to agree the vision and approach, and establish the scope of change. We assess readiness and how the move will affect each group's day-to-day activity. We recommend engaging staff early, while there is still room for their input to shape how the new space will work.

Staff feedback and the design of the space

We treat resistance as feedback: it tells us what matters to people about their work. We set expectations with staff about the scope and are transparent about the level of change input required. We turn what we learn from staff into the pre-design brief for your architects, setting out how people work and what the new space needs to provide. In NSW, WHS law sets an order for controlling psychosocial risk: remove the risk where practicable, and where you cannot, it ranks changes to the physical workplace above training and information. By writing that brief before plans are drawn, we help you design the risk out at the source.

Meeting your duty to consult

We suggest involving your health and safety representatives from the start. With the engagement run under your agreed consultation procedures, we endeavour to make it as seamless and non-disruptive as possible while helping you meet your duty to consult on the change. We tailor the engagement and communications to each affected group, giving teams with distinct operational demands a direct channel to raise issues and work through solutions. We also help you establish internal change champions within those teams, so staff have an advocate they trust involved in the process.

Surveying staff before and after the move

We have specific psychosocial elements in our staff survey tools: a psychosocial safety climate measure and eight questions on how the change is handled and how the space works. Before the move, that survey can sit alongside our user research and observation studies of how existing space is used, giving you a clear baseline of how teams work and how they are feeling. After staff settle in, we can gather early feedback and run a post-occupancy evaluation to show where the new environment is working and where it needs refinement.

A risk register for your WHS team

From what staff tell us, we build a psychosocial risk register for the change and hand it to your WHS team. Formal psychosocial risk assessment stays with your WHS team or adviser.

One engagement, two handovers

Early staff engagement

We engage leaders, staff and health and safety representatives through workshops, observation and pre-move surveys under your consultation procedures.

Pre-design brief

We set spatial requirements before plans are drawn.

Your architects design workspace risks out at the source.

Change risk register

We log the psychosocial risks staff raise.

Your WHS team owns the register and formal risk assessment.

Post-occupancy re-test

We run the survey again after move-in so you can see how the new space works and where it needs adjustment.

Planning a campus or workplace move?

Talk with us early about how staff engagement can reduce the psychosocial risk of your move.